Client: Maven, BC Hydro

We collaborated with Maven Consulting Ltd. to design a replacement dock at Buckley Campground for BCHydro. MidSea Engineering was responsible for the engineering design, while Maven Consulting performed project management. The floating docks were designed to BC Hydro standards. 190 feet length floating dock was constructed using two 25 feet and seven 20 feet docks. The docks were secured to 5 piles. The docks were connected to each other using dock-to-dock hinges that allowed water level fluctuations of up to 12 meters on a daily basis.

​

The design is also easy to assemble and disassemble for seasonal use as the camp is closed during the winter season.