Mill Creek Diversion Hydraulic Improvements
Kelowna BC

Civil and Mechanical Engineering Consulting, Design, Procurement services, and Construction Support.

Client: The City of Kelowna

We worked with the City of Kelowna to improve the hydraulic performance of a flood mitigation structure at Mill Creek. The design aimed to optimize the use of existing infrastructure by using Computational Fluid Dynamics (CFD) and hydrodynamic models. The work also included geotechnical evaluation, consultation with first nations, cost estimation (Class A, B, C, D), structural evaluations and environmental permitting. In addition to providing a detailed design for the Mill Creek diversion structure, we also lead procurement tasks and RFP documents preparation.

​