top of page


Temporary Bypass Plans, Hydraulic Analysis
Vancouver, BC
Client: Stormtec
We work with Stormtec on a regular basis to review plans for temporary bypass systems and plans. The bypass systems required for wastewater chamber bypass, pump stations and wastewater treatment facilities around BC. We have reviewed the plans in hydraulic aspects and provided feedback to optimize headloss, pipe sizes and pump operations.
1/0
bottom of page